Deficiency in Emergency Generator Fuel and Power Maintenance Planning

Plaza Healthcare & Rehabilitation CenterElizabeth, New Jersey Survey Completed on 06-05-2025

Summary

The facility failed to ensure that its emergency preparedness policy included a plan for maintaining generator power and fuel during an emergency. During a record review, it was found that the Emergency Preparedness Policy did not reference any procedures or strategies for keeping the emergency power systems operational in the event of a power outage or other emergency situations. This omission was specifically noted in the documentation provided by the facility. At the time of the survey, an interview with facility staff confirmed that there was no plan in place to maintain fuel sources for the emergency generator during an emergency. Additionally, there was no documented plan for supplying power to the building if the generator failed to operate during such an event. This lack of planning was acknowledged by the staff member interviewed by the surveyor. The deficiency was communicated to the facility's leadership during the Life Safety Code exit conference. The absence of a comprehensive emergency power and fuel maintenance plan was identified as a failure to meet the requirements set forth by federal regulations and referenced standards, including NFPA 99 and NFPA 110.

Plan Of Correction

Element #1 On 6/6/2025 the Administrator and the Maintenance Director went to do an audit on the facility contract and reports with our vendor Powerhouse, which services our generator. In the binder of contracts, we found the contract dated 1/1/2025, stating clearly that Powerhouse will service our facility with fuel throughout the time the generator is on during an emergency and will replace it with a rental if the current generator malfunctions (see policy attached). Element #2 All residents have the potential to be affected by this deficient practice when life safety reports and contracts are not handy and not in the right binder. Element #3 The administrator in-serviced the US FOIA (b)(6) the same day 6/6/25 about the importance of having all reports and contracts related to lift safety, to be stored in the emergency preparedness binder and to check monthly contract and report from the Vendor Powerhouse who services the generator, that they are up to date with life safety compliance. In addition, the administrator in-serviced the maintenance director on the responsibility of having a contracted vendor service the generator throughout the emergency and having a backup generator in case it malfunctions. Element #4 The Administrator will monitor the Maintenance Director for three (3) months starting 6/9/2025-9/9/2025 weekly on having all life safety reports and contracts handy and placed in the Emergency preparedness binder for all life safety compliance. All findings will be reviewed and discussed in the next Quarterly QAPI committee meeting.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other E0041 citations
Failure to Provide Emergency Power During Generator Outage
F
E0041 E041: Implement emergency and standby power systems.
Short Summary

During a utility power outage, the facility's emergency generator failed, resulting in a loss of power. When repairs were needed, the generator was shut down for several hours, and the facility did not secure a temporary backup generator as required by policy, leaving the building without emergency power.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Provide Letter of Reliability for Emergency Generator Fuel Supply
F
E0041 E041: Implement emergency and standby power systems.
Short Summary

The facility was unable to produce a letter of reliability for its natural gas emergency generator during a record review, leaving its backup power supply vulnerable to fuel supply issues. This deficiency was confirmed by the maintenance director.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Lack of Emergency Generator Fuel Supply Agreement
C
E0041 E041: Implement emergency and standby power systems.
Short Summary

Surveyors found that the facility did not have a written agreement with a fuel vendor to supply propane for its emergency generator, as required by federal regulations. Staff confirmed that a contract had been proposed but was not yet in place, leaving the emergency power plan incomplete for all residents and smoke compartments.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Emergency Generator Maintenance Deficiency
F
E0041 E041: Implement emergency and standby power systems.
Short Summary

The facility failed to maintain its emergency generators as per NFPA 99:2012, with the generator not tested under load for the required duration and having a history of failures. Additionally, the emergency generator's remote annunciator panel was non-functional, lacking power indication and a lamp test switch. These issues were identified during a documentation review and observation, with no current MOU for a portable rental generator.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙