F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
F

Failure to Maintain Emergency Power System During Outage

The Villa At The BayPetoskey, Michigan Survey Completed on 05-22-2025

Summary

The facility failed to maintain an operable emergency electrical power system, resulting in a complete loss of power for an extended period following an ice storm. The generator, which was supposed to supply power to the entire facility during outages, ceased functioning and was not promptly replaced with a backup generator as outlined in the facility's emergency procedures. During the outage, staff were unable to access electronic medical records due to insufficient battery backup, and the backup computer could not support both the laptop and printer simultaneously. Emergency kits containing flashlights were initially inaccessible, leading staff to use personal phones for lighting until the kits could be reached. One resident who required 10 liters of oxygen was sent to the hospital for the duration of the outage because the facility was unable to provide adequate care without power. Other residents who relied on specialized air mattresses were switched to standard mattresses. Interviews with the NHA, DON, and a regional clinical RN confirmed that the facility did not follow its emergency procedures for obtaining a backup generator and that there were multiple instances where the generator failed to function properly, impacting the care and safety of all 82 residents.

Penalty

Fine: $169,92029 days payment denial
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0906 citations
Generator Failure and Inadequate Emergency Response for Ventilator-Dependent Residents
F
F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
Short Summary

A facility experienced a complete power loss when its emergency generator failed to activate, leaving all areas without electricity, including ventilators, tube feeding pumps, and other critical equipment. Fourteen ventilator-dependent residents were affected, and emergency (red) outlets remained without power until a portable generator was connected hours later. Maintenance records lacked evidence of required weekly inspections and monthly load-bank testing for the generator in the months before the outage. Nursing and respiratory staff did not initiate manual ventilation (ambu-bagging) as required by the facility’s Emergency Operations Plan, and an RN on duty reported not performing specialized respiratory interventions and focusing on only one ventilated patient. Two nurses on the ventilator unit did not know where backup ventilator batteries were stored, and the RN’s personnel file lacked documented competency in ventilator management and emergency respiratory procedures.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Ensure Critical Respiratory Equipment Connected to Emergency Power
D
F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
Short Summary

A resident with a tracheostomy and chronic respiratory failure was found to have their oxygen concentrator and suction machine plugged into a standard wall outlet instead of a generator-powered outlet. Staff confirmed that only red faceplate outlets were connected to the backup generator, but these were already in use for other equipment. The facility's policy directed staff to move equipment after a power outage rather than ensuring critical devices were always connected to emergency power, and documentation of required safety checks was not provided.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Generator Failure During Power Outage
E
F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
Short Summary

A facility's generator failed during a planned power outage, leaving 13 residents who required oxygen concentrators without power for approximately 15 minutes. The generator malfunctioned due to a faulty oil pressure sensor, which was not detected during annual maintenance. This failure put residents at risk of respiratory distress.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Emergency Power System Delay During Outage
F
F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
Short Summary

The facility experienced a delay in the activation of its emergency power system during a power outage, resulting in a two-minute period without power for emergency exit signs, lighting, and medical equipment. Staff had to manually switch residents requiring oxygen to portable tanks. The facility's policy requires immediate notification of the Administrator and Maintenance Director if the generator fails to activate within 10 seconds.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Emergency Power System Failure
E
F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
Short Summary

The facility experienced a complete power outage due to a failure in the temporary generator, which had been in use since 2020. This outage affected medical equipment, elevators, and refrigeration units, and required manual intervention to restore power. Residents on oxygen concentrators were switched to O2 tanks, and staff faced challenges due to non-functional elevators and a lack of standard procedures for power outages. The deficiency was confirmed during an exit conference.

32 days payment denial
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Delayed Generator Start Causes Power Outage
D
F0906 F906: Provide enough power supply for lighting all entrances and exits; equipment for fire detection and alarm systems, and extinguishers.
Short Summary

A power outage in an LTC facility left 88 residents without power for over 30 minutes due to a delayed generator start. A resident was unable to use their CPAP machine and had to sleep on a deflated mattress. The delay was caused by a breaker switch not being in the 'ON' position, which was discovered after a significant delay.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙