F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
D

Failure to Assess and Obtain Physician's Order for Bedrail Use

Hoosier Health & Living CommunityBrownstown, Indiana Survey Completed on 10-30-2024

Summary

The facility failed to properly assess a resident for the use of bedrails, as observed in the case of a resident who was severely cognitively impaired with diagnoses including unspecified dementia, hypertension, and anxiety. The resident was observed multiple times with half bedrails on both sides of her bed, yet the clinical record lacked a physician's order or an assessment for the bedrails prior to their installation. The Assistant Director of Nursing (ADON) confirmed that an order and assessment should have been completed before the bedrails were placed. Interviews with facility staff, including a Certified Nurse Aide (CNA) and the Maintenance Director, revealed that the process for installing bedrails involved obtaining a physician's order, which was not followed in this case. The Maintenance Director was unaware of when the bedrails were installed for the resident, indicating a lapse in communication and procedure adherence. The facility's policy on the use of bedrails, which requires a proper assessment and physician's order, was not followed, leading to this deficiency.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0700 citations
Bed rails used without required orders, consent, assessments, and care plans
E
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Bed rails were used for three residents without the required documentation and authorization. One resident with hemiplegia and fluctuating decision-making capacity had bilateral half side rails in use, but RN and DON stated there was no current physician order or care plan for side rail use. Two other residents, including one with Alzheimer's disease and seizures and another with hemiplegia and intact cognition, had orders and assessments for 1/4 rails, but were observed or documented with 1/2 rails instead; the DSD and DON stated the specific 1/2 rail use lacked the proper order, informed consent, assessment, and care plan.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Obtain Consent and Order for Four Side Rails
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

A resident with intracranial hemorrhage, respiratory failure, and hypertensive emergency was observed with all four bed rails raised, even though the physician's order and informed consent only addressed bilateral upper half side rails. Staff interviews confirmed the resident was being positioned with four side rails without a specific order or consent for that setup, and the facility policy required informed consent before bed rail use.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Reassess Bedrail Use and Risk
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

The facility failed to complete ongoing accurate assessments for bedrail use for two residents. One resident had weakness, a right BKA, and bilateral enabler bars, while another had CVA with left-sided paralysis and a left enabler bar. Both residents’ last Enabler/Assist Rail/Device Evaluation - V2 assessments were completed about a year earlier, and the ADON confirmed assessments should be done quarterly.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Bedrails Installed Without Assessment or Informed Consent
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

A resident with intact cognition and multiple serious diagnoses had half bedrails placed on both sides of his bed without a documented side rail assessment, informed consent, or evidence that alternatives were tried first. Staff interviews showed the Maintenance Supervisor was told to install the rails without being shown a signed consent, while RN and ADON staff were unaware the rails were in place or that the required documentation was missing. The resident stated he did not request the bedrails and was never spoken to about them.

Inspection fine: $51,756
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Inconsistent Bed Rail Assessment and Use After Resident Falls
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

A resident with severe cognitive impairment and a history of recent falls was repeatedly observed asleep in bed with bilateral upper grab rails elevated. The care plan, updated after the falls, included side rails as grab bars for fall prevention and assistance with repositioning, but the bed rail assessment documented that side rails or assist bars were not indicated, and no bed rail entrapment risk assessment was found. Staff interviews confirmed that the resident used the grab rails for turning and repositioning and that the care plan called for grab bars despite the assessment indicating otherwise, resulting in a deficiency for failing to ensure safe and properly assessed side rail use.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Document Alternatives, Risk-Benefit Discussion, and Informed Consent for Side Rail Use
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

The facility failed to document alternative measures, risk-benefit discussion, and informed consent before side rail use for two residents. One resident with ESRD and severe cognitive impairment and another resident with dementia and intellectual disabilities were observed with side rails raised in bed, but records showed no current order for side rails and no documented evidence that alternatives were explored or that risks and benefits were reviewed with the resident or RP.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across Indiana

Get a heads-up on the newest immediate-jeopardy (J–L) citations in Indiana — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release August 26, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙

Connection lost — reconnecting… We couldn't reconnect automatically. Please reload the page to continue.